FEATURED NEWS & PROJECTS

Opening of Pearl Harbor Memorial Park

December 06, 2018

NEW HAVEN, CT - RED Tech employees were present at the Pearl Harbor Memorial Park Dedication Ceremony on December 6, 2018. RED Tech constructed the memorial park area on the corner of East Street and Water Street as part of a CTDOT project.

Connecticut Road Builders Association Annual Fall Dinner Meeting

November 07, 2018

RED Tech employees attended the 85th Anniversary Celebration Dinner for the Connecticut Road Builders Association (CRBA). RED Tech Vice President and Heavy Highway Division Manager, Jeff Lower, was in attendance as the recently appointed 2019 President of the CRBA. 

Bosco Drive On-Site Soil Treatment

October 01, 2018

NEW BRITAIN, CT - RED’s Environmental Division completed soil remediation operations at 1 Bosco Drive in New Britain, Connecticut.  Over 700 cubic yards of soil was treated on-site utilizing a pugmill machine.  By using this innovate approach, treated soil was able to remain on the site and be reused to backfill the excavation.

RED Names Employees of the Quarter

August 15, 2018

RED Technologies, LLC (RED) named Logistics Manager for Drums and Soil, Mark Barnes and Driver, Carl Sherman Employees of the Quarter.  The Employee of the Quarter (EOQ) Award honors the accomplishments of individuals nominated by fellow employees.  These individuals demonstrate leadership, a high standard of work, and dedication to their role at RED.

Work Begins on CT-69 Improvement Project

June 18, 2018

RED has recently begun working on capacity and operational improvements along Route 69 in the towns of Woodbridge and New Haven, Connecticut. The job consists of road widening, milling and paving, intersection improvements, and new signalization to improve traffic flow and pedestrian access. The CTDOT Project (No. 0092-0672) was awarded to RED Technologies, LLC at a cost of $2,976,691.85 and is scheduled to be completed in September of 2019.

RED Attends 2018 Achievement in Civil Engineering (ACE) Awards

May 23, 2018

On Tuesday, May 22, 2018, RED attended the Connecticut Society of Civil Engineers (CSCE) 11th Annual Achievement in Civil Engineering (ACE) Awards for contributions to the Route 31 Roadway Reconstruction project in Coventry, Connecticut.

RED Set to Manage PCB Transportaion & Disposal for the City of New Haven

April 20, 2018

Work is currently underway at RED to manage the excavation, transportation and disposal of polychlorinated biphenyls (PCB) contaminated material for the City of New Haven. Remedial activities are being carried out for 190 River Street, formerly occupied by the Bigelow Boiler Manufacturing Company, setting the property up for future renovations. 

Senator, Representative Tour Red Technologies, LLC in Portland

March 30, 2018

State Senator Art Linares and Representative Melissa Ziobron recently visited RED to learn more about the business and its Portland location:

 

"This is a thriving company that is looking to grow and hire here in Connecticut. Red Technologies has the type of highly skilled, well-paying jobs that we want for Connecticut workers."

Providing Environmental Services for New Haven Walk Bridge Program

March 05, 2018

RED is currently involved in  the New Haven Line Interlocking Project which will construct a new four-track railroad interlocking located between East Norwalk and Westport, Connecticut. Services RED has provided include the transportation and disposal of non-hazardous railroad ties, carbon vessel replacement, and groundwater storage, transportation and disposal.

Making Way for the South Hartford Conveyance and Storage Tunnel

March 01, 2018

As part of their Clean Water Project, RED is subcontracted under The Metropolitan District (MDC) to provide transportation and disposal of excavated soil for a new four-mile long tunnel designed to store excess wastewater during rain events in the Hartford, Connecticut region. In this massive effort to reduce sewer overflows, RED has managed large quantities of excavated material.

RED Provides PCB Impacted Soil and Concrete Removal

November 01, 2017

RED provided soil and concrete remediation and transportation and disposal services to facilitate the self-implementation cleanup of PCB remediation waste under the Toxic Substances Control Act (TSCA) for an active manufacturing facility located in South Windsor, Connecticut.

RED Takes Part in "Touch A Truck" Event

October 15, 2012

RED contributed one of its Kenworth trucks to The Exchange Club of Portland, Connecticut for its annual "Touch A Truck" event. The RED Mack truck could be seen amongst many other large work vehicles to help raise funds for various programs the club supports.

RED Sponsors 5k Road Race

July 25, 2012

RED became a sponsor for Portland Parks & Recreation's "Come on Over" 5k Road Race being held on August 10th, 2012 at 6:30 pm. All proceeds from the run/walk will benefit the Portland summer camp programs.

RED Technologies, LLC Helps to Keep 14-Year Q-Bridge/I-95 Project Moving

August 08, 2011

RED is providing the management and oversight for all excess spoils and controlled materials for the Q-Bridge/I-95 reconstruction project in New Haven, Connecticut.  The management project itself is worth approximately $8.5 million.  RED will manage upwards to 5,000 cu. yds. of soil daily from all of the ongoing projects.

Please reload

10 Northwood Drive, Bloomfield, CT 06002 
 T: 860.218.2428 | F: 860.218.2433 | info@redtechllc.com 

STAY CONNECTED

© 2018 RED Technologies, LLC